Two men smiling in rural farmland setting with fencing and fields visible behind

Money & Work3 h ago

Mulwala plans 350MW data centre with no town water needed

Local investors propose a 350-megawatt data centre near Mulwala using closed-loop cooling.

Reported by The Border MailClaims checked against the source, 1 h ago.

Why it matters

The design tackles the main concern about data centres in agriculture-dependent regions. Water scarcity could compete with farming and food production.

In Australia. If approved, the Mulwala project could signal how to build data centres in regional Australia without harming water access for farming and towns.

Know someone who invests?Send them this

Key facts

350 megawatts
Data centre size
27 hectares
Land area
Northern edge of Mulwala
Location
Closed-loop in sealed tanks
Cooling system
Today's word puzzle comes from the news.Lede: five letters, six tries. Free, about 3 minutes.Play Lede

Send today's puzzles to your chat

Tomorrow's ten at 7am

One email at 7am with the ten that matter, each with its source. About seven minutes to read, free, and one tap stops it.

What arrives at 7am, shown with today's first stories

InSnipThe Morning Edition, 7:00 am

  1. 1Albanese approval crashes to record low of -31 in latest NewspollThe Conversation
  2. 2Beau Lamarre-Condon trial hears closing arguments in Sydney murder caseThe Guardian
  3. 3Lamarre-Condon trial hears DNA and missing bullet raise doubt of guiltABC News

And seven more, each with its source.

One email a day. We never share your address.

The InSnip app

Free on iPhone and Android, no account needed.

The Deep Dive on every story, Ask the story, and your suburb on one screen.

Download on the App StoreGet it on Google Play

The Deep Dive in the InSnip appYour suburb on one screen in the InSnip app