A $300 million power transmission line is needed to connect the proposed Oakajee oil refinery site to the grid.
Why it mattersA $300 million power-grid upgrade could make the entire refinery project too costly to proceed.
Free. Be genuinely informed in 5 minutes a day. No signup, no noise.
Get the free app, read the whole feed
InSnip turns the day's news into short, source-backed snippets with a plain why it matters line. The signal, not the scroll.